South Bridge Load Testing

Dienvidu Tilts (South Bridge) was tested last week, actually not the whole bridge, but just some entry junctions.
Tens of loaded trucks were used as testing equipment :)
I hope the bridge has passed its exam :)
Now South Bridge is open!
People Reaction (3)
Good grief, can you imagine if the bridge failed???
I don't think it would fail immediately. It would give some warnings like crubling concrete :)
new PHOTO
http://www.fotoblog.lv/img/76101/?cid=1671